Final stages of the wind turbine
Bottom support of the turbine.
Bottom support: Plate that connects support to the frame.
Cleaning the stator which was covered in metal shavings.
Daryl tidied up the magnets on the hub which also were covered in shavings.
Damon removing the lip from the stator so it fitted snugly onto the plate.

Kieran and Gary working together to fasten the plate to the frame.
Bolting the start on.
Close up view.
Peter (tutor) machining down the top support for us.
Peter is a great guy.
Kieran grinding some box steel into shape to be the middle arm/support to fit onto the pipe nicely.
Hub on the stator and starting to take shape.
Cutting the middle arm/support to size.
Final welds on the turbine before we are finished.